This case study examines two Passivhaus bungalows at the Racecourse development: one mid-terrace and one end-terrace. The evaluation of these dwellings was conducted under the Technology Strategy Board’s (TSB) Building Performance Evaluation programme.
Download Summary Download Full Report
Racecourse Estate – GHA BPE Study funded by TSB